The World Laureates Forum permanent meeting site project, 16140 pcs of ASP’s cadmium telluride power generation glass of different sizes are installed in the roof. The power capacity is about 1.3MW with an estimated annual power generation of about 1.4 million kWh, and an annual carbon emission reduction of more than 1300t.